Transcript 0:00 [upbeat music] This is Mike Roberts with Roberts Corrosion Services, and this is the episode to discuss Article 80, the crowded ground bed. [upbeat music] What sparked this article was a subscriber. 0:17 I had a subscriber send me an email and ask if we could talk about the installation issues that come up on impressed current ground beds, mainly the vertical versus horizontal situation. 0:28 The anodes were designed to go in vertical, and for one reason or another, they end up laid down horizontal. How bad could that be? How good could that be? Or how much might it not matter at all? 0:42 And during that same week, we had an installation of our own where we were coming up short on property. 0:48 The bed that was drawn on paper didn't fit on the ground that was there, so we had to make some decisions on what to do. To me, those two are really the same thing. 0:58 They're both installation problems, things that happen in the field that cause a ground bed to be installed not according to the design. 1:06 So the concept I want to carry through this episode is the difference between the design engineer and the installation crew, and how each of them knowing a little bit more about what the other one is doing can help make the CP system more successful. 1:19 If the design engineer understands upfront some of the things that go wrong in the field, and the field crew understands a little bit about why the spacing is what it is or why the drawing says vertical instead of horizontal, both sides are better informed. 1:34 It's really about trying to marry the two together. A good designer already leaves some wiggle room. There's headroom in the rectifier sizing. 1:44 They might order a little extra coke breeze or maybe an extra anode just for chance. 1:50 However, sometimes the thing the field crew runs into isn't something extra material can cover, like running out of space or holes that were planned to go in vertical and can't. That's what we're going to talk about. 2:03 So here's the situation the article opens with. You've got the first stake in the ground, three hundred and fifty feet off the pipeline. 2:12 The drawing shows fourteen anodes in a single line running straight away from the pipe, twenty feet apart, each one augered to fifteen feet. That's two hundred and sixty feet of ground bed. 2:24 You pull the tape and the property line comes up at two hundred and eight feet. The bed is fifty-two feet longer than the ground that was bought for it. 2:33 And as always with these stories, we change the numbers to protect the innocent. This is actually more common than you'd think. I'm surprised every time it comes up, but it happens on a lot of projects. 2:46 Something is laid out on paper and it looks great. The property is purchased, and then for some reason or another, there's just not enough property to fit what was designed. So something has to give. 2:58 And sometimes a crew stumbles into this partway into the project. What you should do is measure the whole bed out before you start digging to make sure you have the space, and most contractors do that. 3:09 But I've seen cases where the first several anodes are already in the ground before anybody realizes they're quickly running out of room. 3:17 That's a different problem because you can't go back and change the spacing on the ones that are already installed. Whatever you decide now, you're deciding it with the anodes that are left. 3:27 Sliding the bed toward the pipe would fix it. But on this job, the owner is firm. The first anode goes no closer than three hundred and fifty feet. And I'm with the owner on that one. 3:38 If I'm the designer, that's where I draw a firm line, not moving the bed closer to the pipeline. I would rather crowd the anodes or go to a different configuration or even add a whole other bed somewhere else. 3:51 If your bed is three, four, five hundred feet off the pipeline, you want to maintain that distance. It really helps the coverage, the current attenuation, and how that ground bed performs on the pipeline overall. 4:04 Whatever distance was designed to put that bed remote, that's the thing to hold on to. So the crew talks it over and three ideas come out. One, hold the twenty feet and leave the last three anodes off. 4:17 Two, hold the twenty feet as far as it goes, then bunch the last few up against the property line. Or three, tighten every space to sixteen feet and get all fourteen in. And this is exactly how it goes in the field. 4:33 Those are generally the three options you're left with when you don't have enough space. The first two come from the same thought, and it's a common belief in our industry, especially on big beds. 4:45 Keep the design spacing and let the last anode or two take the hit. 4:49 You'll hear it said like this, "Better one suffers than all of them," or, "I'd rather have most of the bed installed to the design than move all of them." It sounds right. The math doesn't back it up. 5:05 Meanwhile, the owner's rep is standing there with questions. How bad is it? And what are my options? The installer doesn't always make the call, but the installer is usually the first one asked. 5:18 So let's go through what to tell them. But first, we need a little background on what's happening in the ground. Start with one anode in its coke column. 5:29 It has a resistance to earth, and that's set mostly by the soil resistivity and the length of the column. Put a second one a long way off, wire the two together, and the pair has half the resistance. 5:42 Fourteen of them would have one fourteenth. That's simple parallel math, and it's the best case. It only holds when the anodes are far apart. And I said coke column on purpose. 5:56 I'm not sure all installers are aware of this, but it's not just the size of the anode that gets considered in those design calculations. It's the coke column. 6:06 If you have a 12-inch diameter hole with the anode in the center and coke breeze below it, above it, and all around it, that whole column is what the design looks at as the anode. 6:18 Now, in a real ground bed, the anodes are never far apart. Current leaving an anode raises the voltage of the soil around it, measured against soil far away. 6:28 It's highest at the anode, it fades with distance, and it reaches the anodes on either side. I want to spend a minute on that because I think it confuses corrosion techs sometimes. 6:40 The thought is, well, the soil doesn't have a voltage. But think about setting two reference cells in the ground 20 feet apart and reading between them, looking for a gradient. There's no pipe in that circuit. 6:54 The meter is reading a voltage between two spots of dirt. That's what a DCVG survey is. 7:01 So when the article says the voltage of the soil, it means the voltage of the soil right there compared to the soil somewhere else, like remote Earth. 7:10 We covered that idea in Article 74, Remote Earth is not a distance, if you want more on it. So every anode in the line is pushing current into ground that its neighbors are already pushing on. 7:23 The course manuals call it mutual interference or crowding. The anodes are competing for the same path through the soil. On this example bed, at 20 feet, about 13% of one anode's voltage shows up at the anode next to it. 7:39 At 10 feet, it's about 22%. Add up every neighbor's share along the line, and the 14 anodes in this design do the work of about 8.6 anodes spaced far apart. You don't usually hear it said that way. 7:53 We talk about the crowding effect as some anodes running a little less efficiently. But add those percentages up, and what it really says is that 14 anodes in the ground are only doing the work of eight or nine. 8:06 That puts a spotlight on it. Until we had it up graphically, I didn't truly understand it was that much of an impact. Even an anode at 20-foot spacing is already crowded a little bit. 8:18 And as an installer, that tells me something. If I have extra room and the owner's okay with it, a little more spacing actually helps the ground bed. 8:28 If I'm putting anodes in at 20 feet, but I have the room and enough cable to do it at 25, I know that helps. On this example bed, going from 20 feet to 25 would lower the resistance by about 8%. 8:43 That's the kind of thing I want installers to understand because they can make use of it. None of this is a flaw in the drawing. The designer knew it and counted it. Crowding is in every ground bed ever drawn. 8:58 So the question at the property line isn't whether squeezing the bed adds crowding. It's how much more. The designer's tool for this is Sunday's equation for a line of vertical anodes. 9:11 It's in the article because everyone loves a little math. My only concern there is that as soon as people see a bunch of math, they get turned off. 9:21 What I like about how the article handles it is that it doesn't just hand you the equation and the variables and leave you to plug them in. I don't want to run the full equation every time or set up a spreadsheet. 9:33 What I want to understand is how it works, which variable, when I change it, does what to the answer. And there are four bullet points right after the equation that do an excellent job of that. 9:45 To me, that's the gold nugget of that section. First, what it's calculating. The answer is the resistance of the whole ground bed to Earth, and that's how you judge a ground bed. You're aiming for lower resistance. 10:00 What goes in is the soil resistivity, the number of anodes, the length and diameter of the coke column, and the spacing between anodes, center to center. 10:10 Most of the equation is that simple parallel answer from a minute ago. One anode's resistance divided by the number of anodes. The last piece of it is the crowding. So four things. 10:23 One, spacing is on the bottom of the fraction. Tighten the spacing and you're dividing by a smaller number, so the crowding penalty gets bigger. Two, the length of the coke column is on top. 10:36 The longer the column, the bigger the share of the bed's resistance that comes from crowding. Three, the number of anodes is inside the logarithm. Every anode you add crowds all the others a little more. 10:49 It's still good to add one. The resistance of the bed as a whole still comes down. It just doesn't come down as much as you'd expect, and we'll get to that. And four, soil resistivity multiplies everything. 11:02 The same squeeze costs more ohms in high resistivity soil. You don't have to run it to understand it. Run this bed through the equation at one spacing after another and you get a curve. 11:16 There's a chart of it in the article. It's an illustrative example. 14 anodes on 10-foot coke columns in 10-inch holes with the same soil top to bottom. The design is 20 feet. 11:29 Tighten it to 18 and the ground bed resistance goes up about 4%. At 16 feet, about 10%. But close them into 10 feet and it's about 38%. At 5 feet, it's more than double. 11:44 So the curve is gentle near the design spacing and steep once the anodes close in. That shape is why designers settle where they do. 11:53 Spacing is a trade, resistance on one side and cable, trenching, and right-of-way on the other. Past the knee of that curve, more spacing buys you less and less. A good rule of thumb comes from Peabody's. 12:07 A ground bed design can be called a success when the finished bed consistently lands within 10% of the calculated resistance. The calculation itself is only that good. 12:17 So a change that moves the bed four percent is lost in the noise. 12:21 A change that moves it thirty-eight percent is a different ground bed, and a rectifier sized for the design may not have the voltage to push its current through it. 12:30 A couple of feet is inside the tolerance of the calculation. Half the spacing is a different ground bed. We do need to make a point here. That chart and those percentages are only relevant to this one ground bed. 12:44 It's not a chart you can use on any job. You can't go with the theory of, well, if I move it four feet, it increases eight percent. That doesn't hold true because it's specific to this bed. 12:56 More anodes or longer columns make that curve steeper. Fewer or shorter ones flatten it out. What you can do is take it to your design engineer. 13:06 You already know what variables he needs to run these calculations, the resistivity, the number of anodes, the coke column, the spacing. Give him that, and he can come up with a chart for your bed. 13:17 And if somebody has something way outside of this box and wants to talk about it, they're more than welcome to contact us, and we'll help where we can. One more caution. 13:26 Ten percent more ground bed resistance is not ten percent more rectifier voltage. The bed is one piece of the circuit, along with the cables, the pipe's own resistance to earth, and the back voltage. 13:40 Back to the property line and what to tell the owner's rep. Sunday's equation assumes every space is the same, so by itself, it can't compare the three ideas. But the same math can be set up with every gap different. 13:54 Hold all the anodes at one voltage and solve for the current each one carries from where it sits. So we looked at this bed all three ways and ran the numbers. Again, these are for this example bed. 14:08 Spread it, all fourteen anodes at sixteen feet, and the bed comes out about nine percent over the design resistance. 14:16 Crowd the end, hold twenty feet for the first ten anodes, then fit the last four spaces at seven feet, and it's about eleven percent over. 14:24 Drop three, hold twenty feet and install the eleven that fit, and it's about twenty-two percent over. 14:31 So what's obvious from the math is that putting the anodes in at the design spacing and then leaving off the last few or crowding in the last few is the worst approach. 14:41 You're better off resetting the spacing on all of them. You hear it talked about the other way because most folks look at it individually, anode to anode. 14:51 They think, if I have a ground bed with fifteen anodes, I'd rather have twelve of them put in according to design, and the last three can be scrunched up at the end. 14:59 However, the reality is you have to look at it as a whole. That's why it's called a ground bed. It's not a single anode. The placement of all the anodes affects the output of all the anodes. 15:12 You have to think of it as one unit, and if we're out of space, then that entire unit needs to change. And resistance is only half of it. The other half is what each anode carries. 15:25 In any line of anodes, the ones on the ends carry more current than the ones in the middle because an end anode has neighbors on one side only. Spread this bed to sixteen feet, and those shares barely move. 15:38 Crowd the end, and the squeezed anodes carry less, while the anode at the far end picks up more than the design gave it. 15:45 Drop three, and the eleven that are left each carry about a quarter more current than the design gave them for the life of the bed. And anodes are consumed by the current they discharge. 15:57 Spread the shortage, and no anode suffers much. Drop one, and every anode left works harder. To be fair to the belief, it holds up when the miss is small. 16:08 Come up ten feet short on this bed, and shortening only the last space costs the same as trimming a little off every space, between one and two percent either way. It stops working as the shortage grows. 16:22 There's an overall point in there. Even if you're crowded, sometimes crowding is better than dropping the anode. This comes up a lot in congested areas, like stations. 16:34 We're trying to put some anodes in behind a tank or back in a far corner of the station, and there's room for one anode, maybe two, in ten or fifteen feet. They're going to crowd each other. 16:46 You're going to lose some efficiency, and they won't work as well as two independent anodes. They'll still work better than one. By the same math, two anodes twelve feet apart work like about one point seven. 16:59 Even at six feet apart, they work like about one and a half. That's the next question, every time. And the answer is yes, but less than most people expect, because each added anode crowds all the others. 17:14 On this bed, two more anodes in the same two hundred and eight feet buy back about half of what the squeeze cost. Getting all the way back to the design resistance takes four to six more. I'd still say adding more helps. 17:28 If there's an additional anode that can go in, or some additional coke breeze that can be added to the anodes, that's only going to help the resistance of the bed. Just don't expect it to do the whole job. 17:40 The other lever is rectifier voltage, if the unit was sized with the headroom. Past that, the designer has options the installer doesn't. 17:48 Longer coke columns, a different type of bed, or a second row of anodes where the site is wide but not long. That last one does happen. 17:57 They might decide to split the bed in half, because there's enough width to run two separate legs of anodes at twenty feet inside the room they have, instead of one single string. There are always options. 18:08 You just have to talk it over with the design engineer to make sure it's going to work. What not to do is slide the bed somewhere else without new soil resistivity measurements. 18:18 One of the course manuals tells of a ground bed that was moved 30 feet toward the foot of a hill for right-of-way reasons, and nobody took new measurements. 18:26 It came in at about 10 times the resistance it would have had at the original spot. A few feet of spacing costs single digits. The wrong soil costs multiples. Now the subscriber's question. 18:41 Say the owner approves 16 feet and the crew starts augering. 11 holes go to 15 feet. Three don't. The auger stops on rock at about eight feet. The crew moves over a few feet and tries again, and it stops again. 18:57 And it's not always a rock shelf. A lot of times it's rocky soil or a boulder right at the spot you need, or loose soil where the hole won't hold its shape and starts to cave in. 19:09 It can give you a lot of grief trying to do it with an auger. So the crew moves around and tries a few spots before they ask. Most owners don't want an anode set in rock. 19:20 So after a couple of tries, the request goes up the line. Can these three go in horizontal? As an installer myself, I can tell you a horizontal installation many times goes easier. You're using a bucket on an excavator. 19:34 You're basically digging a little grave for the anode, and there's not a whole lot that goes wrong with that. So the knee-jerk reaction is always to lay them down, and that's very accepted in our field. 19:45 A lot of people think that as soon as the auger gives us trouble, we just switch and lay them down horizontal. I get that. However, I want installers to understand that it could be a big difference. 19:57 It might not be, but it might be. If the design was for vertical, we really should be aiming for vertical and not dismiss it because it's more difficult and we'd rather do horizontal. 20:09 Start with why the drawing said vertical. The main reason is moisture. Vertical anodes can usually be placed in permanently moist soil, which generally means lower resistance and fewer anodes. 20:22 The depth on the plans isn't arbitrary either. The design is built on the soil resistivity and the water table at that depth. Vertical anodes also fit where surface area is limited. Now, what horizontal changes? 20:36 The surprise is that the geometry costs very little. 20:39 In the same soil top to bottom, one anode in an eight-foot coke bed laid at six feet deep comes out about 8% higher in resistance than the same anode in its 10-foot vertical column. 20:51 Stretch that coke bed to 10 feet and the two are about even. Lay three of this bed's 14 anodes horizontal and the whole ground bed moves about 1%. The risk is the soil. 21:05 Every number in the article assumes the soil is the same from top to bottom, and it never is. The vertical column works the ground from five feet down to 15. 21:15 The horizontal anode sits in the top six feet, the part that dries out in a dry season. 21:20 If the resistivity at the site gets better with depth, the horizontal anodes are in the worst layer, and the equations make them look better than they are. If the best soil is on top, laying them down may cost nothing. 21:34 So the question to send the designer is this. What did the four-pin readings do with depth? A reading at a given pin spacing averages the soil from the surface down to about that depth. 21:47 Readings at five, 10, and 15 feet tell the story. And if nobody has them for that spot, they take a few minutes. 21:57 As a rule of thumb at RCS, if we have to switch to laying the anodes down, we also put more coke breeze on them. Not just because the hole is a little bigger and it takes more to fill it. 22:08 We're trying to help the bed a little bit. What helps a ground bed is lowering that resistance, so it's not going to hurt to add a bag or two in the same hole. 22:17 On our jobs, a typical horizontal anode gets 12 bags, five in the bottom, set the anode, seven over the top. And if you're adding coke, add it as length along the anode. Length is out front in the equation. 22:32 Diameter is inside the logarithm. On a vertical anode, it's a bag or two in the bottom of the hole, center the anode and hold it there, then pour the rest around it and over it. 22:44 Either way, vertical or horizontal, the anode ends up in the middle of the coke, completely covered with no voids. Depth helps too, mostly for the moisture. 22:55 By the equation alone, taking the anode from four feet down to eight lowers its resistance by less than 10%. And a common minimum is about three feet of burial. 23:06 To be clear on that, it's three feet of cover measured to the top of the installation, not to the center of the anode, and it doesn't mean a three-foot hole. 23:15 All of the coke breeze and all of the anodes sit at least three feet below grade, so you're still digging a rather large hole. 23:23 And since the coke column is what counts as the anode, you'll see some designs go one step further and call for a continuous coke column. 23:31 They'll ask you to dig a trench, let's say 150 feet long, space the anodes evenly in it, and fill the entire trench with coke breeze. That makes the row act like one long anode. It can be very effective. 23:45 I just don't think it's very common. It takes a lot of coke breeze to fill a trench like that, and coke breeze gets expensive. But it is out there. We've put in several that designers have asked for. 23:57 I said up front that I have a couple of ideas for the design side, so here they are. Something I always thought I would do if my job was design engineer is this. Let's say the design needs a 10-anode bed. 24:12 I would design it for 10 anodes. But when I did the layout drawing, I'd put 12 locations on there. I'd call the last two alternates. 24:22 So the installer is putting anodes in, they get to number four or five, and that one can't go in according to the design. Well, now anode number eleven is up to bat. It gives you a little bit of bench room. 24:35 And if everything goes great and all ten go in, that's fine. The two alternates were only ever on paper. 24:42 Most of your cost is in the excavation, having the crew out there, getting the permits, your utility locates, moving the dirt. 24:50 A couple of alternate locations on a drawing and maybe a little extra material is well worth it next to all that. The note just says, "Alternate anode locations in case one through ten don't work." 25:02 Some designs already do a version of this for the rock problem. The drawing says to attempt vertical first and allows horizontal if it's needed. Another thing to be aware of is how the holes actually go in. 25:15 If you ask for a ten-inch diameter hole, a crew is very capable of giving you that, but it doesn't necessarily come from a ten-inch auger. 25:24 When you're augering, everything's vibrating and moving, you're pulling dirt up and out, and the hole gets wallered out a little bit. Whatever size auger you have, you end up with a bigger hole. 25:34 Run a ten-inch auger, and you might have a twelve-inch hole by the time you're done. So when you're deciding how much coke breeze goes in each hole, I'd add a little extra. 25:44 On most jobs, none of this is the installer's call. The installer's job is to see the problem first and contact the right people with some options. 25:55 That's always something you pass up the ladder and discuss with the design engineer because there might be reasons for doing something different. 26:03 Most ground bed drawings carry a note that any change has to be approved by the design engineer. And SP zero one six nine says the same from the other direction. 26:13 The work follows the construction drawings and specifications. Exceptions need the appropriate approvals, and every deviation goes on the as-built drawings. 26:24 On the job behind this story, the design engineer ran the numbers, the owner agreed to sixteen feet, and the full bed went in on the ground that was there. 26:33 And whatever changes, document it, the spacing, which anodes were laid horizontal, and how deep. The next person to troubleshoot that ground bed will be working from the drawing. 26:45 And a lot of times, that next person is us. As a company, we spend a lot of time going back to installations that were put in by other folks. 26:55 Not that they did anything wrong, but the owner has a CP system that's not functioning the way it was designed, or it's not protecting the structure it was supposed to protect, and we have to troubleshoot it and figure out what happened. 27:08 And there are always these little nuances. Was it put in according to design? Was it able to be put in according to design? Was the design enough to begin with? 27:19 I think it's better to get on the front end of that and help people understand more about what they're doing so those problems don't come up in the first place. That's not a dig against anybody. 27:29 I just want to take a more shared knowledge approach. Then check it. When the rectifier is energized, the resistance check tells you where the circuit landed against the design number. 27:41 Article seventy-eight, the first tap is misleading, covers how to take that reading without fooling yourself. So let's recap. Crowding is in every ground bed. The anodes in a line share the soil. 27:56 A small squeeze is a small cost, right around the tolerance of the calculation. If you come up short, spread the shortage across the whole bed. Don't drop anodes. A couple more anodes help, less than you'd expect. 28:11 Horizontal isn't the problem. The soil it sits in might be. So ask what the resistivity did with depth, add your coke as length, and cover the anode completely. 28:21 Changes go through the design engineer and onto the as-built, and don't relocate a ground bed without new soil resistivity measurements. The bigger takeaway is the one we started with. 28:33 The designer and the installer each knowing a little more about the other's side is what gets a ground bed in the ground that works the way it was drawn. 28:42 The full write-up with the equation, the chart, and the figures is on the newsletter site, Field Notes from RCS, Article eighty, The Crowded Ground Bed. 28:53 This one started with a subscriber's question, and I always appreciate getting those. 28:57 If you're an installer or a design engineer who does this a lot and you've run into struggles with certain things, please bring them up. 29:04 Subscribers who are logged in can comment right on the article, and we read every one. Or send me a message. 29:11 Those are the things we can talk about in future articles and future episodes, and getting that information out there only helps CP Systems be more successful. One last thing. 29:21 There's something new in the newsletter, a tip jar. You'll find it right after the key takeaways in the article, whether you read it in your email or on the newsletter site. 29:30 It was actually requested by folks who like the newsletter and wanted a way to help keep it going. We want to keep field notes from RCS free for everybody. Anybody can subscribe, and it can be shared and passed around. 29:42 But if you believe it's helping the industry and you have the means, you're welcome to throw a couple of bucks in the tip jar. You can even leave a note with it. That is greatly appreciated. 29:53 Until next time, this is Mike Roberts with Roberts Corrosion Services, and we'll see you on the next one. [outro music]